What OpSage Costs, and What It Can Save
Most restaurant software pitches skip one number: what the software costs as a share of your sales. Operators think in points of sales, so that's how we'll lay it out.
We built an internal model to estimate what OpSage can save a typical location. It runs on public industry data, results other restaurant companies have published, and our own list prices. Below is what it shows, starting with the firmest number and ending with the softest.
What OpSage costs, per $100 in sales
OpSage Growth is $59 a location a month on an annual plan, or $708 a year. At a typical fast-casual location doing $2.8 million in sales, that's about 2.5 cents for every $100 you sell. Trim food or labor cost by 2.5 basis points, roughly 40 minutes of staff time a week, and the platform has paid for itself.
Bigger restaurants clear that bar sooner. A $4.9 million casual-dining location breaks even at 1.4 basis points on Growth, while a $1.94 million quick-service location needs 3.6.
What one point is worth
Every point of food or labor cost is worth $10,000 a year for each $1 million in sales. At $2.8 million, one point is $28,000 a year, or about 26 staff hours a week at the average restaurant wage.
That matters because margins are thin. Restaurants keep about 3 to 4 cents of each sales dollar as pre-tax profit, based on the National Restaurant Association's 2024 medians, so one point of cost saved can raise pre-tax profit by a quarter or more.
It also beats chasing sales. New sales bring their own food and labor costs, so at typical margins $1 saved on cost is worth about $1.50 to $5.25 in new sales. That's a long way from the $25 you sometimes hear quoted.
Labor alone covers it many times over
Restaurant chains that started scoring every location against its labor target have reported cutting labor by 1.5 to 2.5 points of sales within a year. One public chain went from about half its restaurants hitting their labor targets to more than 90%. Those companies changed how they managed at the same time, so no single tool gets the credit.
Our model assumes far less: about half a point of labor. At a $2.8 million fast-casual location, that comes to roughly $13,700 a year, about 19 times what Growth costs.

Most of it comes from moving locations that run over their labor target closer to it. The rest comes from hour-by-hour staffing, trimming shifts ahead of bad weather, and manager time no longer spent building reports by hand.
The full estimate: about one point of sales
Add food, prep and discounts, and the model puts the total at about $30,600 a year for a $2.8 million fast-casual location. That's about 1.1% of sales and 43 times the cost of Growth. Across a 60-location group, it's about $1.8 million a year. The same model gives about $25,700 for a $1.94 million quick-service location and $42,900 for a $4.9 million casual-dining location.

Treat the full number as a starting point. The biggest single piece, over- and under-prep, uses values from the demo restaurant in our OpSage Daily video: how many prep flags a week, how many pounds each, and what a pound costs. Those inputs don't change with the size of the restaurant. In a pilot, the prep guide and your own inventory counts replace them with real numbers.
Published waste research gives a check on the food side. Restaurants that worked on kitchen waste cut it by about a quarter in the first year, and over three years the average site cut the cost of wasted food by more than 2 cents for every dollar it spent on food. At a typical fast-casual food cost, that's about 0.64% of sales. Our model counts 0.40%.
What it takes
Installing software saves nothing on its own. The savings show up when managers act on what they see.
Each morning, OpSage shows every location's labor % against its target, the weather and local events coming, a likely sales range for the day, and a prep guide that flags which items are rising or falling. Each alert gets an owner, and the district manager follows up until it's closed. The money comes from those small calls, made every day at every location.
How we estimate
- Sales per location: medians of public chains in their latest annual reports: $2.8 million for fast casual, $1.94 million for quick service and $4.9 million for casual dining.
- Food and labor cost: National Restaurant Association 2024 medians: 32.4% food and 31.7% labor at limited-service restaurants, 32.0% and 36.5% at full-service.
- Hourly labor cost: $20.44, the August 2026 U.S. Bureau of Labor Statistics average for nonsupervisory restaurant workers (wages only).
- Price: OpSage Growth at $59 a location a month, billed annually. Enterprise is priced to scope.
- New sales count only the profit left after their own food and labor costs.
- No double counting: event days, bad-weather days and ordinary days are counted separately, and each saving is counted once.
These estimates come from published industry data and other restaurant companies' results, not from OpSage customers. Your results depend on your own operations.
Run it on your numbers
Send us your sales per location, food cost, labor cost and number of locations. We'll run the model for your group and show you where the savings come from. Talk to us

